Advanced Category: Maintenance Planning & Strategy • ~6 min read

RCM-Style Decision Worksheet

Conduct structured Reliability Centered Maintenance decision audits on critical systems.

Q:

What are the 7 questions of SAE JA1011 Reliability-Centered Maintenance?

Standardized under SAE JA1011 / JA1012, RCM evaluates: (1) Functions, (2) Functional Failures, (3) Failure Modes, (4) Failure Effects, (5) Failure Consequences (Hidden, Safety, Environmental, Operational, Non-Operational), (6) Proactive Tasks (On-condition, Scheduled restoration, Scheduled discard), and (7) Default Actions (Run-to-failure or Redesign).

SAE JA1011 Decision Worksheet

All 7 questions of classical Reliability-Centered Maintenance

Total Failure Modes
2
Hidden Failures
1
Operational Loss
1
Safety & Environmental
0
Subsystem / FunctionFailure Mode & EffectConsequenceSelected Task & IntervalRoleAction
Advertisement

Structured Reliability-Centered Maintenance

RCM ensures maintenance resources focus strictly where failure consequences matter, eliminating ineffective calendar-based PMs on random-failure equipment while protecting critical safety and operational barriers.

Engineering & Regulatory Notice: The calculations, projections, and failure models provided in this suite are for engineering estimation and educational purposes. Verify all calculations and assumptions independently before making operational, equipment replacement, safety-critical, or regulatory compliance decisions.

Recommended Next Steps in Reliability Workflow