The 4 Stages of SMED Implementation
1. Document current changeover via video. 2. Separate internal from external steps. 3. Convert internal steps to external. 4. Streamline all remaining steps via quick-clamping and standard tooling.
Slash machine changeover downtime by converting internal steps to external preparations.
Client-Side Privacy Guarantee
The data you enter is processed in your browser and is not uploaded. Ads and analytics are provided by Google separately.
What is Single-Minute Exchange of Die (SMED)?
Developed by Shigeo Shingo, SMED aims to reduce manufacturing equipment changeover times to single digits (under 10 minutes). The core breakthrough is separating Internal Setup (tasks that can only be done while stopped) from External Setup (tasks done while running).
1. Document current changeover via video. 2. Separate internal from external steps. 3. Convert internal steps to external. 4. Streamline all remaining steps via quick-clamping and standard tooling.
Isolate production losses and identify machine bottleneck downtime drivers.
Lean & Continuous FlowEstablish accurate labor cost standards and defensible operation cycle benchmarks.
Lean & Continuous FlowTrack continuous shop-floor discipline and maintain workplace organizational compliance.