Q
AshToolbox Quality Lean Six Sigma Suite
Advanced Category: Statistical Process Control (SPC) • ~8 min read

Cumulative Sum (CUSUM) Chart

Rapidly detect persistent subtle process drift before standard Shewhart charts signal.

Client-Side Privacy Guarantee

The data you enter is processed in your browser and is not uploaded. Ads and analytics are provided by Google separately.

Q:

Why is CUSUM superior to Shewhart charts for detecting small process shifts?

Standard Shewhart charts only evaluate the current point and require large shifts (1.5σ to 3σ) to trigger quickly. The Cumulative Sum (CUSUM) chart accumulates deviations from target over time, detecting subtle drifts (0.5σ to 1.5σ) up to 4 times faster.

Reference Value (K)0.2500.5 × σ
Decision Interval (H)2.3854.77 × σ Threshold
Max C+ Accumulation10.10Upper Sum
Shift Signal Status5 Shift AlertsSmall-Shift Detection

Tabular CUSUM Architecture & Decision Limits

Tabular CUSUM maintains two running sums: C⁺ for positive upward drift and C⁻ for downward drift. The reference allowance is typically K = 0.5σ, and the decision threshold is H = 4.77σ.

!
Engineering Disclaimer: These tools and calculators are intended for engineering analysis, educational study, and operational guidance. They do not constitute formal regulatory certification (such as medical, aerospace flight-critical, or statutory safety filings) without independent audit and sign-off by a certified Quality Engineer or Six Sigma Black Belt. AshToolbox is not affiliated with, sponsored by, or endorsed by AIAG, ISO, ASQ, or any standards body.

Recommended Next Steps in Quality Workflow

\n